Holiday KoreaGet the app · 10,000 H Points on sign-up
Get
← All attractions
Gangwon-doAttraction

Uiam Hydropower Plant

Gangwonteukbyeoljachido Chuncheonsi Sindongmyeon Yetgyeongchullo 62-11

Destination briefing

Why travelers stop here

Uiam Hydropower Plant is located downstream from the confluence of the Bukhan River and the Soyang River in Uiam-ri, Sindong-myeon, Chuncheon-si, Gangwon-do. The Uiam Hydropower Plant generates electricity in conjunction with the upstream Chuncheon and Soyanggang plants and the downstream Cheongpyeong plant. The electricity produced here passes through transmission lines connected to the Cheongpyeong Hydropower Plant and is supplied to the Gyeongin region, playing a part in the power supply for the Seoul metropolitan area. Additionally, by regulating the inflow from upstream, it supplies water during dry periods and plays a role in flood control during the summer when water levels rise. The construction of the Uiam Dam for the Uiam Hydropower Plant created an artificial lake, Uiam Lake, around which a beautiful natural landscape has formed, attracting many visitors each year.

OTA-ready stop

Built into inbound routes and day-tour planning.

Local context

Gangwonteukbyeoljachido Chuncheonsi Sindongmyeon Yetgyeongchullo 62-11

Travel fit

Attraction · Gangwon-do

Holiday Korea

Holiday Tour Travel Concierge

Holi

Hello! I’m Holi, your Holiday Tour travel assistant. Ask me about tours, bookings, or a custom itinerary anytime.